天堂中文在线官网Iwww.色94色.comI狠狠撸视频I人妻无码一区二区三区久久I久久香蕉影院I福利网在线I豆花av在线I一区二区三区91I麻豆视频在线免费观看I欧美xxxx视频I国产1区2区3区I免费在线观看小视频Ia猛片免费播放I午夜福利一区二区三区I中文字幕无码人妻少妇免费I欧美激情在线看I四虎网站在线I日韩在线精品强乱中文字幕I99reeI97精品人妻一区二区三区香蕉I国内久久I日韩一区在线播放I日本特黄一级I女的被男的操I夜夜做天天干I91污网站

Contact Us

Inflatable Air Blower cleaning process

Date: 2015-1-5   Click: 1608 Times

Finishing "Inflatable Air Blower" must pay attention to the fan power cord and clip the button, the line to be sorted out in advance, do not let the fan run when working on the line to produce a variety of contact, the power cord is in the initial position of the fan in general (both removed available).
Adjust the position of the radiator
The radiator tune in the right place, the place "Inflatable Air Blower" level to the processor port cover side, four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. The radiator tune into the right position, the fan will be placed horizontally to cover the processor port side, the four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. Motherboard Intel processor buckle hole distribution in the vicinity of the CPU socket, the user can easily observe the board found. Intel original radiator have to look at before installing rotary switch is fully restored in situ. "Inflatable Air Blower" As a result of the heat sink clip clip pressed four buckle design, so the best way is to install the clip "diagonal" push installation method. Order push uneven force likely to cause the fan, causing the other two buckle pressing difficulties.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 山阳县| 南靖县| 宁明县| 南投市| 广灵县| 化德县| 永平县| 靖州| 乳源| 和顺县| 长海县| 柳河县| 临武县| 偃师市| 东明县| 苍山县| 乐安县| 霸州市| 黄大仙区| 惠安县| 衡阳市| 宜君县| 霍山县| 宁南县| 包头市| 通化县| 鄢陵县| 民权县| 赣州市| 安福县| 德保县| 溧水县| 芒康县| 翁源县| 铁岭市| 孝昌县| 东源县| 奉贤区| 阿克陶县| 肃南| 囊谦县|